HAGSTRÖM PROJEKT AB

HOME

 

Extensive pipe sanitation operations

"What's everyone looking at?"

 

 400-meter tunnel dive                           

 

"Pull your gut in!"

Oil sanitation operations

Dock inspection process

Descending diver

Classified tunnel 

Rock reinforcement in tunnel

Hammering in Danvikens pump station

Cleanup Danvikens pump station

Clear Cutting Danvik pumping station

Diving outside Lidingö

Casting of steel beams

Stockholm Hamn Entreprenad

Can it become so much better

Removing water hose stuck in the bow thruster

Reinforcement of bridge Tattbybron Stockholm

 MEDIA

 

 

Hammering in mountain tunnel                                                                                Inspection of steel pipes under railways tracks at Central station

 

 

  

 

 

Inspection of tunnel waste water under the ground                                                                                        Inspection of drinking water tank

Oil industrial compound in Norway (Statoil)

Preparation for underwater construction

Sanitational diving at a water purification plant in Stockholm

                                                                                                                   Safety first!!

Constructionwork Stockholm                                                                  New Kirby Morgan 37

 

Salvage of boat Lidingö

Danvikens pumping station

Per Hagstrom with heavy diving helmet handmade in Karlskrona shipyard in 1942

Milling of wood port for mounting gasket                                                                        Mounting wood wall to block water

     

Work with buoy stones with Stockholm Hamnentreprenad

Work with a bow thruster on the ship Bauge

Reinforcement of bridge Tattbybron Stockholm

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAGSTRÖM PROJEKT AB